Kenom
0
- Joined
- May 4, 2007
- Messages
- 5,628
- Points
- 63
Re: GB feeler laser barrels
I'm pretty sure it will take a few weeks for us to hammer out the prototype from the manufacturing companies end. Get everything ready then from there it is a matter or a week or two to machine the barrels. it will be a bit back and forth letting everyone see what we've come up with and showing them specs of the design. Ballpark I'd say 1 month to a 1 1/2 months. I should have in hand by then the boards and clicky's and boots and last but not least the lenses. It's a matter of quickly assembling the clickies, and boot, then screwing in the lens and ship em off. 2 months tops.
I'm pretty sure it will take a few weeks for us to hammer out the prototype from the manufacturing companies end. Get everything ready then from there it is a matter or a week or two to machine the barrels. it will be a bit back and forth letting everyone see what we've come up with and showing them specs of the design. Ballpark I'd say 1 month to a 1 1/2 months. I should have in hand by then the boards and clicky's and boots and last but not least the lenses. It's a matter of quickly assembling the clickies, and boot, then screwing in the lens and ship em off. 2 months tops.