- Joined
- Aug 17, 2011
- Messages
- 78
- Points
- 8
Picked up this rig a few weeks back, awesome seeing the AOM blanking and love the HeNe glow it is doing 28mw. The Ar ILT was just rebuilt may of 2012. Putting out just over 100mw and six lines it only has 161 hours on it. This uses GS120 scanners running of image engineering card cage drivers.
While I love the gas technology, will probably be moving this on as it is so large for the space I have. Check out the video of it in action.
While I love the gas technology, will probably be moving this on as it is so large for the space I have. Check out the video of it in action.
Attachments
Last edited: