daguin
0
- Joined
- Mar 29, 2008
- Messages
- 15,989
- Points
- 113
I was expecting lots of rough draft outlines this weekend. I'm not getting as many as I had hoped. I guess my students are going to do poorly on this assignment. I didn't plan any fun for this weekend. It's too hot to go play with the argons in the garage. I guess I'm going to have to build something.
The little spirograph?
Start working on the scanner?
The next step in pushing the 803T?
Maybe I should try to figure out how much voltage that weird power source is putting out.
I should figure out how to get inside my 2500 remote interface to figure out what "popped"
Yeah. I'll do that first. I can do that at my desk and I've really gotten spoiled with the digital read out right on the power source.
Thanks for listening
Peace,
dave
The little spirograph?
Start working on the scanner?
The next step in pushing the 803T?
Maybe I should try to figure out how much voltage that weird power source is putting out.
I should figure out how to get inside my 2500 remote interface to figure out what "popped"
Yeah. I'll do that first. I can do that at my desk and I've really gotten spoiled with the digital read out right on the power source.
Thanks for listening
Peace,
dave