GoRdOn_B
0
- Joined
- Jul 12, 2008
- Messages
- 634
- Points
- 28
I ordered a SF-BW512P sled for o like a few weeks ago..
I was fortunate enough to have put it all together the other night.
so far i have about 45 mins run time on it.
the host is a romisen cree i had my old phr in. i must have put 1000+ hours on it before i retired it. I hope this one lasts as long.
this build im using a microboost @ 600ma and 405 glass lens, the heatsink is copper
i lit a match almost instantly at like 12 feet
:drool:
I was fortunate enough to have put it all together the other night.
so far i have about 45 mins run time on it.
the host is a romisen cree i had my old phr in. i must have put 1000+ hours on it before i retired it. I hope this one lasts as long.
this build im using a microboost @ 600ma and 405 glass lens, the heatsink is copper
i lit a match almost instantly at like 12 feet
:drool: