IWLSR5
New member
- Joined
- Apr 15, 2022
- Messages
- 23
- Points
- 1
I’m currently working on two builds and am wondering on how you figure out the duty cycle.
The diodes I’m working with are:
NUBM4F at 5A
NUBM07 at 3.5A
Both are going to be in SL S4X hosts with copper heat sinks. Is there a formula for calculation duty cycles or do you just run them until the host gets warm?
The diodes I’m working with are:
NUBM4F at 5A
NUBM07 at 3.5A
Both are going to be in SL S4X hosts with copper heat sinks. Is there a formula for calculation duty cycles or do you just run them until the host gets warm?