Welcome to Laser Pointer Forums - discuss green laser pointers, blue laser pointers, and all types of lasers

LPF Donation via Stripe | LPF Donation - Other Methods

Links below open in new window

ArcticMyst Security by Avery

New host design feeler: GE-X1






Joined
Feb 5, 2008
Messages
6,252
Points
83
I am declining heatsink orders this week and previous one, so I can clear out time to get these done. First two are going to the people who payed for tooling, Daguin and RBC.
 
Joined
Dec 17, 2012
Messages
2,081
Points
63
I agree with that 100%

Looking forward to seeing this. Will be nice to add a decent size host to the collection.
 
Joined
Feb 5, 2008
Messages
6,252
Points
83
Well I can say that, after what's-it-been, 16 years, I am finally commencing production.

Estimates are that I should have first one done by the end of this weekend, if not maybe Monday.

So yeah. Can't wait, actually.
 
Joined
Jun 7, 2007
Messages
1,771
Points
0
At the very left.. the battery's shadow isn't right. Will that happen in real life?
 
Joined
Feb 5, 2008
Messages
6,252
Points
83
Yes it's correct, the battery is floating above the ground some inch or two.

Unfortunately DX is freshly out of stock on floating batteries, so you're going to have to settle for regular ones I'm afraid.

Also since the thread's been bumped, one GEX host is nearing the end, word from home is, it'll be done today.
 
Joined
Feb 5, 2008
Messages
6,252
Points
83
LOL, "great one". Flattered, but, don't call me that :eek:

Me too, they should be taken and sent when the host's done, I'll have my dad do that ASAP, also I should personally inspect the functionality when I get home before shipping it off, making sure all the components fit as I planned for them, batteries fit, threads are right and everything.
 
Joined
Apr 26, 2010
Messages
4,175
Points
83
So is the initial presale back in 2012 still the original numbers? Or will we redo the presale?
 
Joined
Feb 5, 2008
Messages
6,252
Points
83
Heh I dunno, but I do seem to see some interest, regardless I'm making these available.

It might be a good idea just to post who is STILL interested in buying any. First two that are made, as I said, go to daguin and RBC, how many more should I plan on making?

Apparently these aren't THAT difficult to make as expected, they actually take bit less time than Phobos, even though they're larger they are actually simpler, fewer steps needed.
 
Joined
Feb 5, 2008
Messages
6,252
Points
83
Lookie lookie...

http://i690.photobucket.com/albums/vv263/Eudaimonium/DSC_0218_zpse297966a.jpg

Standard brushed aluminium finish:
http://i690.photobucket.com/albums/vv263/Eudaimonium/DSC_0219_zpsfbefa9da.jpg

The tailcap inside:
http://i690.photobucket.com/albums/vv263/Eudaimonium/DSC_0222_zpsc0147cdc.jpg
It will fit your standard DX switch. I didn't press any into this one yet.

A battery barrel with 26650 cell in it:
http://i690.photobucket.com/albums/vv263/Eudaimonium/DSC_0221_zps4df5e46d.jpg
It will obviously fit 32650 very comfortably, as well as 18650 with adapter and 2x 16340 and 2x18350 combinations easily.

The head, with the driver socket visible:
http://i690.photobucket.com/albums/vv263/Eudaimonium/DSC_0223_zps4b4ecd25.jpg

It further takes apart into two:
http://i690.photobucket.com/albums/vv263/Eudaimonium/DSC_0225_zps0f1e8077.jpg

Head alone:
http://i690.photobucket.com/albums/vv263/Eudaimonium/DSC_0229_zpsd357a0df.jpg

http://i690.photobucket.com/albums/vv263/Eudaimonium/DSC_0231_zps779a3bf0.jpg

Imagine a focus adapter up there.

I will only need to widen the 14mm DX switch port for about half milimeter, and that's about it. I have tried and seen that the standard 16mm board will fit normally into the socket (needs to be pressed in there very hard, didn't do this on this host yet), there's quite enough room for wiring, and any module. Also, square drivers will fit into the top part of the driver section, here:

http://i690.photobucket.com/albums/vv263/Eudaimonium/DSC_0227_zps95b47c26.jpg

So yeah, here we go. Dream becomes reality.

Official production time is 3 days for each host (technically 3 afternoons because of dad's job).

Now, since both Daguin and RBC payed for tooling in equal parts, could you two guys communicate and agree on which of you is the first to recieve their host? I have a new bulk order from Blord to make before the second host, he already payed for it so I'm obligated to prioritize it.

Let me know what you think. I'm also welcome on any ideas.
 
Last edited:





Top